Daily production notes on projects under construction at Smoky Mountain Woodworks. Slip on a pair of safety glasses and come on in!
Monday, January 2
Friday, December 30
Status report
Today was another mixed bag of a day. I should have been out stacking lumber since it is not raining today, but I over-did it a bit the last time and I’m still “stove-in” as Marie put it and I’ve been ordered to find some light duty stuff to do today.
<a href="http://www.smokymountainwoodworks.com/InTheShop/ShopNotes/2005-12-30.jpg"><img alt="Click Me" hspace="5" src="http://www.smokymountainwoodworks.com/InTheShop/ShopNotes/2005-12-30.jpg" width="200" align="left" /></a> I went out to the shop long enough to check on the billets I milled out a few days ago and assure myself that they have to twisted or warped as they’ve dried out. They seem to be OK.
The pulls I ordered arrived yesterday, so I fired the extra one off to Jim for final approval. They look like they may be a tad too dark in color judging from the pictures he sent. If they’re just a little off, but everything on the
Most of the day today I’ve been working on the article about building the island: cropping and formatting pictures, producing thumbnail images and writing the text. I should have a considerable amount of it done and ready to post this evening.
I hear the UPS truck coming up our drive; that will be the rest of the hardware I need. ‘Scuse me a moment…
OK, I’m back. It’s all there and the hinges are a perfect match for the pulls I’ve got. I think we’ll have to go with what we’ve got and hope Jim and Ruth will be happy with it.
Time to get back to my writing and uploading of picture files.
Have a great New Years!
Thursday, December 29
Early Morning Session
This morning I am again working on web site maintenance and bookkeeping. I have received shipping confirmations from both of the suppliers I ordered hardware from, so those things ought to be here soon.
I’ll try ordering my rail & stile and raised panel bits this morning too.
Yesterday afternoon
I managed to get the White Oak re-organized and consolidated as well as getting a good start on the walnut – which is included in three different stacks – before darkness fell. I heard thunder off to the west of us, so I made sure the lids were put back on the stacks and weighted with concrete blocks to keep them in place before going in and returning to bookwork.
Wednesday, December 28
Catching up.
The past few days have been kinda weird as far as work goes. But then this week normally is: a few days in between major holidays, End Of Year bookkeeping roaring down on us like a freight train, prepping for taxes just after.
Add to that the pleasurable distraction of having my sister and her boys visiting for Christmas, and the unpleasant business of Patrick going into diabetic convulsions yesterday evening. He’s OK now but he scared us pretty badly, and his insurance will be getting some whopping bills because the hospital decided – after they’d gotten him conscious and stable again -- to run a battery of tests including a CAT scan. I’ll withhold my skeptical commentary about that, this isn’t the place.
Yesterday Paul and Charlie (my nephews) helped me get started on sorting out my lumber yard. The problem is that as I’ve bought new lumber – and had no empty racks on which to stack it for drying, I place it on top of a short stack of something else. But that means that the lumber on the bottom will be ready to use before the stuff on the top, and the species are mixed, making it a bit confusing to keep track of what is what. Since I have to take inventory this week, that is a double problem. So we set out to re-organize things so each rack is one species and the oldest, driest lumber is on top, and the newest, wettest lumber on the bottom. It took us a couple of hours but we got the silver maple rack done before Pat had his seizure.
This morning I dug into the white oak rack. I didn’t get very far before I got rained out. My helpers decided to go home a day early. They say it’s because they want to stop in
It is not easy work.
During the rain I went into the office and printed out a mess of reports for Treasures. It’s year end there too, and for them I have to do all the usual company books, but also print and mail out inventory summaries and pay statements to the 46 artists whose work is represented in the gallery. And of course the software won’t just spit those out for me, I have to configure each one and print it out individually.
I just completed my lunch break and mail run. The rain has stopped, so I’m heading back out to the lumber yard.
On Monday I brought enough maple to build the
Hopefully the hardware I need for Jim’s island will arrive soon so I can get back to work on that.
T.T.F.N.
Monday, December 26
Workday Begins: 6:30 AM
I’m spending this early morning time working on e-mail messages that were flagged for follow-up but not yet attended to, and working on the In The News section of the Treasures web site.
I had all our news clippings glomped together into one long page for each year… thought it would make browsing through the clippings easier that way. But it takes so long for those pages to load that if you’re interested in an article near the bottom of the page you will be waiting an awful long time for the pictures to come in. If I were to convert the website from HTML to PHP I could set it up so that a visitor could choose to look at articles one at a time or elect a “show all” option and just read as they come in. But that is probably more work than benefit at this point.
I’m not sure what this day will hold. Technically, this is a work day like any other, and I ought to be in the shop making sawdust like any other. But the boss has decided to take a day off, and my presence may be required. I know we are doing the breakfast in bed thing this morning (my suggestion) so I will not get to the workshop at my usual time. But it is expected to be a warm day, if rainy, so I’d hate to squander the whole thing holidaying. ![]()
Friday, December 23
Testing, testing, is this thing on?
I’m checking to see if this alternate mode of posting will work for this blog. I may have to do some tinkering to figure out how to get pictures to post.
Wish me luck.
www.SmokyMountainWoodworks.com
Your source for quality, custom furniture
I glued up the other two door panel blanks and scraped the glue blips off of the first two. I’ll let them set up overnight before trying to break them apart. If they don’t break, then the glue job this morning took and they’re ready to use. If they do break, I joint them again and re-glue them in warmer temps.
Next I went outside and dug into the lumber piles to get a few boards that will be suitable for making the maple top.
My lumber yard needs some organizing. I have a couple of teenage boys coming to visit over the week between Christmas and New Years, I think I’ll try to shanghai them into helping me restack some of this stuff to sort it out properly.
Marie called, said she’s on her way home and our Christmas vacation is officially started. Put down the tool and back away slowly.
Workshop closes: 3:30 PM
I have some details to finish up before quitting for the weekend, shouldn’t take more than an hour.
Work day ends: 4:30 PM
Thursday, December 22
There is plenty of daylight left but it’s so cold out today (got down in the low 20’s overnight and hasn’t gotten above 30 yet) that I can’t get the workshop warmed up. It will be back in the 50’s tomorrow. Today seems like a good day to work inside.
Tuesday, December 20
The drawer box is done and test fits nicely.
The sun is going down, the heat stove has burned down and it’s getting chilly in here. This is a good stopping point, so I’ll go find something to work on inside.
Workshop closes: 5:17 PM
I need to do some searching on-line for some suitable drawer pulls. Wish me luck-- the Internet has not been kind to us lately. Heavy holiday traffic I suspect.
Work day ends: 8:30 PM
Monday, December 19
Here is the cabinet with the toe kick attached and the drawer fronts installed.
Workshop closes: 5:00 PM
Did I mention that I’m putting together a more detailed article on construction of this island? Well, I am. You can see it by clicking here. It’s not complete yet, but I’ll work on it as time permits.
I also have to continue working on the new Treasures of Appalachia store site. It takes a lot of work to get it set up, but will take much less work to maintain it later on.
Work day ends: around 10:00 PM Marie needs this computer, so I have to go ahead and post my notes and move to the other computer.
Friday, December 16
While the glue dries on those I’m building the toe-kick base that goes under the main cabinet. I’m installing the fixed casters because I picked those up in Morristown the other day, but I couldn’t find the leveler/feet I want under the other end, so I’ll have to mail order those.
I also cut a mess of screw hole plugs and plugged up all the holes. Those have to set overnight so the glue will set up so I don’t yank them back out while trying to trim them flush. So… it’s time to quit for the day.
Workshop closes: PM
I’m going to work a bit on the article I’m doing as I build this island. I’ve been taking lots of pictures and will add the discussion part as I can. That will be active soon and will cover such fascinating things as how to cut your own screw hole plugs. I’ll probably work until 10:00 or so as usual, but will post these notes now so Marie can have this computer. I’ll go do the rest of my work from the other one.
Work day ends: @10:00 PM
Thursday, December 15
The purpose of this attachment is to support wide panels (like doors) securely in a vertical position as I pass them through the table saw with the blade tilted about 5° to cut that edge bevel.
The better way to do this is with a big bit in a shaper – but I don’t have a shaper. But with a little ingenuity, a good table saw, the proper blades and a fixture or three a woodworker can get by without things like a shaper and a jointer.
I have to let the poly dry overnight, so will go work on a couple of bids that have been sitting on my desk for eons.
Workshop closes: 4:30 PM
Working on bids and bookwork.
Work day ends: 9:55 PM
Tuesday, December 13
I’ve got all the blanks for the drawer fronts cut and jointed. The first pair are glued and in clamps now. The others will follow this afternoon as the clamps become free.
I didn’t get a whole lot more done… the pairs of drawer front blanks are glued up. Those I worked in as I worked on another project that presented itself as needing to be done today – before it starts raining again.
Workshop closes: 5:00 PM
This evening I’ll post an article for the Tourism Council in which we were involved. Then map out our route for tomorrows trip to “the city” for supplies and a washer.
Work day ends: 9:15 PM
Monday, December 12
I’ve installed the tricky little corner pieces that support and contain the center divider panel. And I’ve done the final fitting on the cabinet end caps and glued them in place. A little cleaning up here and there, and the casework on the cabinet is complete.
Tomorrow I’ll turn my attention to drawer fronts and doors.
Workshop closes: 5:00 PM
Working on the Treasures shopping cart tonight. Also got ANOTHER order to process from T.O.A… holiday shoppers! Love it!
Work day ends: 8:45 PM
Friday, December 9
This morning I drilled the holes and installed the sockets for shelf pins, and installed the center panel in the cabinet.
Then I turned my attention to making some nice marshmallow roasting sticks.
Workshop closes: 12:00 PM
Time to gather together all the stuff we’re going to need tonight and get ready to load the truck as soon as Marie gets here.
The downtown thing went very well, and our marshmallow roasting station was a hit. Or at least our fire pit was a hit! We had 6 vendors and some live bluegrass in the tent.
I’ll unload the truck tomorrow
Work day ends: 10:20 PM
Thursday, December 8
This afternoon I succeeded in get in the floor panels cut and installed, and the center divider cut, and in making the rather tricky little backer strips that will hold the center panel in place. I can’t mount the panel until I get the shelf pin holes drilled. I’ll do that tomorrow.
Now I have to put a finish on a dog feeder station I’ve been working on so we can deliver it this weekend.
Workshop closes: 5:45 PM
More additions and changes to be made to the Newport In The City map I volunteered to produce. The event is tomorrow – I hope they are finished with the changes!
Work day ends: 9:30 PM
Wednesday, December 7
OK, the other panel is trimmed to size, wiggled, sniggled and shaved to precise fit and installed in its slots. I did not glue that end frame together because I still have to fit the smaller upper panel in the hole above it. That panel is glued up now and I’ll trim it to size and install it tomorrow.
I didn’t get the cabinet floor or divider done today. Too much time spent waiting for glue to tack up in the cold.
Workshop closes: 5:00 PM
Working on a special project for the City of Newport – I’m doing a fancy graphical map for their Christmas In The City event this weekend.
Work day ends: 9:45 PM
Friday, December 2
Here we have the frame all assembled (mostly without glue) and the stiffener panels in place. These panels are used behind the false drawer fronts because this unit presents a special challenge.
In order to keep the unit as small as possible, yet have as large as possible of doors, the rails are thinner than I would normally make them. This means the mortise & tenon joints are narrower as well. Since this island will be used as a cutting block and work surface, it’s going to get leaned on quite a bit. To keep the frame works as rigid as possible, I installed these BBP stiffener panels into tightly fitting groves. They work as bracing to back-up the joints.
Workshop closes: 4:30 PM
We’re going to a Christmas party in Newport tonight, so I have to get cleaned up and dig out some clean overalls. (grin)
Work day ends: 5:15 PM
Thursday, December 1
This afternoon I cut the half-lap joints where the center stile (vertical) crosses the drawer rails and milled the grooves where stiffener panels will be inserted behind false drawer fronts.
Then I engaged in what I call fuss-budget fitting. This means carefully checking each joint for proper fit and making sure the grooves end in nice square corners – no bumps or lumps to cause problems later and making sure all joint fit properly.
If a joint is too loose, then the glue will not hold – for glue (except epoxy) has no structural strength if it’s own. To get a well glued joint, the wood must be in firm contact so the glue will bond it. If a tenon wiggles in its mortise at all, the joint will fail and weaken the case. If a joint is too tight, then once glue is applied and the wood swells up a tad, it won’t go together. The tenon may seize up half-way into the mortise. Attempting to force a seized joint together with a mallet or clamps can cause other parts to break. A nice snug fit: not too tight but with no wiggle to it, when dry will produce a very strong joint once it’s glued.
Workshop closes: 4:00 PM
Time to get cleaned up, change into warmer clothes as I will be spending most of the evening outdoors and head back to Newport.
Post notes.
Work day ends: 4:15 PM