I spent my woodworking time today installing the rest of the hardware; hinges, latches, the lock and the strap handle bales. This involved laying out the locations, punching for the screw holes, drilling pilot holes and installing the screws to hold the hardware in place.
Then testing to be sure everything works as it should. It does. Now that all the hardware is attached, the next step is to strip it all off again.
But I’ll stop here for today, Marie is due home any moment with a load of groceries to be carted inside, see you next time!
What We’re Building:
Walnut Steamer Trunk for David B. – In Progress
Utility Trailer Make-Over for David B. - In Progress, sort of
4 Tray Tables, all walnut (custom size) with stand for Shelly
3-Tier Bottle Stopper Rack, all red oak for Donna
4-Tier Bottle Stopper Rack cherry & maple for David K.
3-Tier Bottle Stopper Rack (Standard) for Dan G.
Kitchen organizer - Marie B.- Producing Design
4 TV Tray Tables and stand in maple for Jeffrey P.
Computer Desk for Laptop for Marie B.
Printer Cabinet for Marie B.
No comments:
Post a Comment
Appropriate comments are welcome. All comments are reviewed before being posted. Spam messages (anything not a direct discussion of this message) and all profanity will be deleted. Don't waste your time or mine by posting trash here.