Daily production notes on projects under construction at Smoky Mountain Woodworks. Slip on a pair of safety glasses and come on in!
Friday, November 25
Work day begins: 6:45 AM
A quick check of e-mail, then I’m off to start warming up the workshop. It got down into the 20’s last night, it will be cold out there.
Shop Opens: 7:15 AM
The first order of business this morning will be to lay out, drill and install the wooden pegs in the 4 stopper racks that I’ve been working on.
Construction is complete and the finish sanding done. The shop is vacuumed and the tools put away. After lunch I’ll spray finish the four racks: two for Daniel, two to go into Treasures to replace some of the five that were sold in the last week. This will be the last batch of stopper racks to be completed this year.
I got the four racks sprayed and inspected. Packaged up two of them for Daniel, as he has already made his balance payment on-line.
Workshop closes: 5:30 PM
Prepare a shipping label for this package. It’s going Parcel Post, so I’ll have to run it into town tomorrow. Adjust inventory at Treasures to show the 2 added racks as available.
Work day ends: 6:00 PM