Today we took the dry-fitted base parts apart again and did things to prettify them. That's mountain-speak for making them less blocky and dull looking. To find out what we did and how, just CLICK HERE.
Daily production notes on projects under construction at Smoky Mountain Woodworks. Slip on a pair of safety glasses and come on in!
Tuesday, November 3
Prettification
Today we took the dry-fitted base parts apart again and did things to prettify them. That's mountain-speak for making them less blocky and dull looking. To find out what we did and how, just CLICK HERE.
Friday, October 30
Completing the Case, Starting the Base
I'm sorry folks, I've kind of forgotten to pop in here and write up the summary of each days' activitiy this week. So, let me get you caught up.
Then we milled the parts to build a base, and test fitted them. CLICK HERE for the scoop on that. So, we're rounding third and heading for home. Just need to jazz up the base structure some before we glue it all together and lacquer it and it will be ready to hand off to David.Monday, October 26
Top Struts
This was a very weird day. One of those days where everyone wants something and all that takes up so much time that you don't get what you planned to do done. Except that I did get what I planned for today done, but that too is weird because of the way it all worked out.
Just one paragraph added today. Click here and scroll down if you want to follow along.
Friday, October 23
Hinges, Jigs & Doors
Today we did a jig, whacked a bevel and used some Chem Class knowlege to make shiny-new into grungy-old in just minutes. Read all about it HERE
Wednesday, October 21
Building the Box
Tuesday, October 20
Changing Table
Friday, October 16
Door Dilema
Today I am continuing to attempt to solve the problem we had with the combination hinge/supports used on the drop front of this desk.
As you may recall, the units I originally bought would not lay out flat, causing the drop-front part of the desk to slant up toward the user and create an awkward working surface.
So I replaced them with a set from another manufacturer. The function is the same, but the design is a little different. These *do* lay out flat as they should, but because the
knuckle of the hinge sits well above the plane of the hinge strap instead of in-line with the hinge strap as the others did, when the hinge closes it LIFTS the door as it hinges up creating about a 1/2" gap at the bottom of the door. When I mortise the hinges into the desk bottom and door the gap will be reduced by 1/8", but it will still be visible.
The only solution I can come up with at the moment is to cut matching bevels on the desk bottom and the door creating a lip that will stick down when the door is closed to help hide the gap. The only other solution I can come up with would be to go back to the first hinges and try to "stretch" them out to lay flat, which may simply destroy them. If I modify them I can not return them for credit or refund. As Winnie The Pooh would say in this situation,
"Think, think, think... I think I need some honey." only in my case it would be chocolate.Thursday, October 15
Making Cubby Parts
Wednesday, October 14
Completing parts blanks.
Then I got ready to swap out the new drop-front hinges for the old ones and trimmed all the cubby parts blanks to size. More On This...
To swap the hinges I needed to plug the old screw holes and lay-out new ones. I custom made the tiny dowel-like plugs by hand for the end screws on the lid because they will show. For the others, which will be under the hinges I used epoxy wood filler. The new screw holes are quite close to the old ones, and I need the old ones to be filled in solid so the new screws will hold well. The lid now lays out flat like it should, but these brass hinges are thicker than the finished steel ones were, so I will want to mortise them into the surface, and I will need to soak them in Brass Darkening Solution to antique them to match the rest of the hardware. I'll detail these steps when we get to the Mounting The Lid step later on.Thursday, October 8
Wednesday, October 7
Completing Top & Bottom
Today we completed making the parts for the top rails and bottom plate and mounted some hardware. We ran into a snag with some of that hardware, however...
More...
Tuesday, October 6
Top and Bottom Parts
Today we made the bottom plate, top rails, and milled the joinery that will attach these parts to the side panels. We closed out the day by dry-fitting the casework.
Details and more photos are HERE.
Monday, October 5
Trimming the Ears
The final step in preparation of the frame & panel assemblies is to insure that the panels won't crack from contraction and glue them up. Full details are HERE.
Friday, October 2
Filler Panels
Today we completed the filler panels and fit them to the panel frames. The full story is HERE. Thursday, October 1
Diversification
For the past few days I've been working on milling the rail and stile stock for David's Compact Computer Desk. That task has been completed and I will move on to making the filler panels that go into the frames today.
It has taken me quite a while to get this done because of several things. One is the hip injury that still harrasses me, another is our Economic Disaster Survival Plan.
In order to survive slow periods like the one our country is currently experiencing we have diversified our revenue streams. This is working for us: now that the woodworking is slow other income sources have picked up and we are avoiding the fate that has befallen so many other small shops. But working in those other arenas means I'm slower at getting this project done. Fortunately, our client is being patient with us. Normally I would just work longer days to get a reasonable amount of work done on all fronts, but the hip is preventing me from doing that. If I push it too hard, the thing will never heal.
Tuesday, September 22
Roughing Filler Panels
Monday, September 21
Resawing panel parts
Produced, burned and posted the weekly radio show in the morning.
Spent the afternoon resawing and gluing up panels. Details are here. By day's end my parts cart is getting pretty well filled up with roughed-out parts blanks.
Thursday, September 17
We're Baaaack!
Wednesday, June 25
Tray Rails
Monday, June 23
Sanding Ribbon Panels
Friday, June 20
Ribbon panels
Thursday, June 19
Parts Blanks
Marie and the Legal Beagle have given me permission to proceed with Kathleen's HD TV Tray Tables even though we have not yet received the check for the 2nd progress payment. I hate to delay the other orders too much, and even if Kathleen should skip the country on us we can always sell a set of cherry TV Tables. So, we forge ahead.
I start off by running the rough lumber through the surface planer to just skin off enough of the rough, "tanned" surface to see clearly what the coloring and graining is underneath. Then I take the skinned boards into the assembly room, which will for today serve as a staging area, and lean them up against the wall so they are all where I can see them. The templates then join us and I begin the process of selecting which boards will become which parts.
As I lay out the various parts on the boards, I chunk up the long lumber into billets using the chop saw for cross-cutting and the table saw for ripping. These billets are stacked on a rolling cart (on the left) along with the templates for each part.
That uses up most of the morning. The rest of the day is spent trimming and planing the billets to parts blank dimensions. By the end of the day all of the parts blanks are done and we are ready to begin forming parts... but we'll do that next time.
Wednesday, June 18
Starting a new project
Tuesday, June 17
Done!
Cutting Boards
Details are HERE.
Doug
Friday, June 13
Cut Boards
Wednesday, June 11
Truckin!
Unfortunately the storms have prevented me from opening up the lumber piles to extract the maple I need to build three cutting boards. So I decided to use this time to get caught up on my article writing and get some badly needed rest.
So, Long Rails has been updated and completed, and you may step through the rest of the article by clicking the NEXT link at the bottom of each page.
I’m going to do some cleaning up and putting away in here then, as soon as the rain lets up enough to get back to the house safely, I’m going to go take a nap!
Doug
Tuesday, June 10
Mummification
Tim will be up here tomorrow afternoon to load and head out, and he expects to arrive at their destination Thursday afternoon. So… this one is about done.
Next up: more cutting boards.
Doug
Monday, June 9
Finishing Line
I will continue to alternate between assembling and finishing today. As soon as the first bench is dry enough that it will not act as a dust magnet I’ll roll it out and take the other bench in for its second coat. It takes about an hour and a half to oil and wipe one of these benches. Hopefully this evening I will be able to apply the first coat to the third bench.
This finish requires a minimum of 24 hours of cure time between coats, so I can not apply the second coat to the third bench until Tuesday evening, and the trio of English Garden benches should be ready to hit the road to Vermont Wednesday afternoon.
Once they are on their way, I am going to take a well deserved day off. I’ll use part of that to complete the construction article on these benches. Until then, I’m focusing on getting them completed.
Doug
Friday, June 6
Home Stretch
Tim has been coming in a couple of times per day to at least keep me company and lend a hand when he can. Tim, a retired trucker will be making this delivery for me because he can get them there in one day where the truck line will take two, and by loading them onto his trailer, wrapped in plastic instead of having to build crates for them I can save another two days of production time. That’s 3 days saved… might be just enough to meet our revised deadline.
Once that’s all done we’ll move on to the finishing stage.
We have been snapping photos as we go along, but have not had time to format them and write the accompanying text. We’ve been concentrating on getting the woodworking done since this trio of benches needs to be *Unloading* in Vermont one week from now, and the finishing alone will take 3 days to accomplish. I’ll complete the construction diary as soon as I get some slack in the schedule.
So I’d better get back to work, got to go make seat slats!
Doug
Friday, May 30
Long Rails
Thursday, May 29
Short Rails
During this day I also got the last three long rails glued up, the last one is in clamps now.
See you next time! Gotta go now...
Doug