Daily production notes on projects under construction at Smoky Mountain Woodworks. Slip on a pair of safety glasses and come on in!
Tuesday, October 3
Monday
Today I milled the parts for and built the toe-kick cabinet that goes in under the lower part of the book case. I sanded it to 100 grit and attached it to the lower case.
Then I made plugs for the pocket hole screws that may be visible and went back around and plugged all those holes and sanded them smooth.
Then I sanded the rest of the book case, inside and out, to 100 grit. This is construction sanding. I haven’t gotten into the finishing work yet. I’m just smoothing things out, removing glue stains, and looking for any problems.
I scared myself silly this afternoon. I have made allowances for Dr C’s baseboards so they will not have to be removed, but while I was sanding I realized with a start that I had not allowed for crown molding. These cases will go clear to their ceiling, what about the crown molding?!?
However, a look at the photos of the room this will go into shows that the room does not have crown molding. We have seen a number of houses recently that do have it and it must have just stuck in my mind and my mind played a cruel trick on me. But, all is well now. And onward we go.
This completes the case construction for one book case. I still have to mount the shelf standards, but that will not be done until after the case is stained. So I’m setting the cases aside (as much as I can in my small shop) and going to work on the shelves tomorrow.
See you then,
Doug
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Appropriate comments are welcome. All comments are reviewed before being posted. Spam messages (anything not a direct discussion of this message) and all profanity will be deleted. Don't waste your time or mine by posting trash here.