Daily production notes on projects under construction at Smoky Mountain Woodworks. Slip on a pair of safety glasses and come on in!
Monday, December 18
Monday
This morning was spent packaging up the bag handles for In The Bag and milling out parts for the two remaining bottle stopper racks in the list.
After lunch I utilized the warm sunny weather to chop out some tie-back trenches up on the high hill. I figured I should use the daylight for outside chores and till go back to the workshop this evening and work late. Otherwise I’m not going to get everything done before construction starts.
After supper I indeed went back to the workshop and finished cutting all the mortises in Rev. Calvin’s desk pedestals, then hand fitted and dry assembled them.
That pretty will used up this day.
Doug
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Appropriate comments are welcome. All comments are reviewed before being posted. Spam messages (anything not a direct discussion of this message) and all profanity will be deleted. Don't waste your time or mine by posting trash here.