Daily production notes on projects under construction at Smoky Mountain Woodworks. Slip on a pair of safety glasses and come on in!
Friday, December 29
Friday
I put in a long day today and got quite a bit accomplished. Unfortunately, this new (non-beta) version of Blogger refuses to accept photos, so I can’t share pictures with you. Sorry. Hopefully they'll get that fixed and I can go back to showing you what has been accomplished.
Basically, I trimmed and squared the door/drawer front blank and cut it into a door and matching drawer front. Then I cut the parts needed to build the drawer box, including a pencil tray. I’m using a sliding dovetail joint to attach the drawer sides to the drawer front, so I cut those. Then cut the grooves and dadoes needed to house the dividers and bottom.
Before assembling the drawer I needed to stain the oak drawer front, so I took time to do that as well as the door. When it was dry enough to handle safely I put the drawer together and mounted the drawer slides, then mounted the door hinges.
The door and drawer front don’t quite line up right so I’m chiseling pockets in the door and case to correct that. I got it almost done before quitting time, and will finish it up tomorrow.
Doug
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Appropriate comments are welcome. All comments are reviewed before being posted. Spam messages (anything not a direct discussion of this message) and all profanity will be deleted. Don't waste your time or mine by posting trash here.